Project: BuckRV-8   -  
            Listing for Category : Wheel Pants
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3964.35
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 02, 2024     Wheelpant filler, seams, joggles, nutplates, and profiling. - (4.3 hours)       Category: Wheel Pants
1. Began working on fixing the seams at the top of the gear leg fairings, which have opened up slightly since they were installed. I will probably also tighten up the fore & aft gaps a bit while I'm at it.
2. The gear leg fairings had slight misalignments when they were installed on the airplane, so I decided to add some small alignment joggles, like I did on the wheel pants. I cut small strips of 0.032" aluminum and flush-riveted them to the edge of the fairing. They work perfectly.
3. Upsized the outboard axle-support holes in each faring to #8, and did the same on the axle supports themselves.
4. Drilled the R inboard wheel pant bracket for #8 nutplates.
5. Re-profiled the L wheelpant to get rid of a slight ridge on the inboard top side.
6. Filled several divots on the trailing edge of the wheelpants.
7. Primed all the parts for a final look.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.